MDRC (MODULAR DATA RECOVERY CENTER) AND PIC (PROJECT INTEGRATION CENTER)
The Modular Disaster Recovery Centre and the Project Integration Centre designs were completed in 2016 as part of the New Port Project in Doha. The Modular Disaster Recovery Centre spans a total area of 2,400 m², featuring a modular, containerized IT space of 1,200 m², and operates at a Tier III level to ensure reliable performance and uptime, supported by an IT connection power of 1,600 kW.
The Project Integration Centre covers a total area of 1,300 m², with a modular containerized IT space of 380 m², also operating at a Tier III level. It is supported by an IT connection power of 440 kW. JEPA provided comprehensive services for both facilities, including detailed design, supervision, and certification by the Uptime Institute, ensuring adherence to the highest technical and operational standards.