Close

ERMIONI MARINA

The Marina Ermionis project at Portochelli, Ermionida Port, encompasses the construction of breakwaters with docks and associated land facilities. The design includes an eastern windward floating breakwater approximately 270 m long and 4 m wide, with two docks (E1 & E3) that extend naturally into the main breakwater at point D. Additionally, a western leeward breakwater is being constructed, measuring approximately 160 m long and 4 m wide, also featuring two docks (W1 & W3). The project also incorporates a coastal frontage in front of the marina that includes essential land facilities, comprising Building A for wash facilities and restrooms, Building B for accommodations and spare parts storage, and Building C, which houses control systems for power, water supply, and fire protection. Furthermore, a floating fuel station will be established, equipped with a supply and distribution network for fueling moored or incoming vessels.

JEPA is actively involved in the detailed design of this project, ensuring that all installations meet the highest standards of safety, efficiency, and operational effectiveness. The docks are designed to accommodate 291 vessels of various sizes, connected to water and electrical networks through supplying stations.

1

Client

MARINA ERMIONIS S.A

2

Location

ARGOLIDA, GREECE

3

Sector

TRANSPORT, INFRASTRUCTURE, INDUSTRY, MANUFACTURE

4

Period

2014

5

Services

DETAILED DESIGN

Related Projects

STOP SA FACTORY & OFFICES

STOP SA FACTORY & OFFICES

2019

NATIONAL CENTER FOR EXCELLENCE OF LIVESTOCK FOR ASSETS AND GENETIC

NATIONAL CENTER FOR EXCELLENCE OF LIVESTOCK FOR ASSETS AND GENETIC

2017

VIOLEX BIC SHAVING BLADE FACTORY

VIOLEX BIC SHAVING BLADE FACTORY

1994-2015

IRIS PRESS PRINTING FASCILITIES

IRIS PRESS PRINTING FASCILITIES

2001

FOLLI-FOLLIE OFFICES & WAREHOUSE

FOLLI-FOLLIE OFFICES & WAREHOUSE

2000

CHATZIMICHALIS BOTTLING FACTORY

CHATZIMICHALIS BOTTLING FACTORY

1997

Jepa lines Jepa lines vertical