CATH LAB AT SISMANOGLEIO ATHENS GENERAL HOSPITAL
The project involved the study of the MEP (Mechanical, Electrical, and Plumbing) installations in the ground floor area of the new Sismanoglio Hospital building, where a Hemodynamic Laboratory was established. The planned installations for the spaces serving the Hemodynamic Laboratory encompassed critical systems such as a water supply system, drainage system, air conditioning, heating, and ventilation systems, high voltage electrical installations, grounding systems for medical equipment, low voltage electrical installations, medical gas systems, fire protection systems, and a Building Management System (BMS). Each component was carefully designed to ensure a safe and functional environment conducive to high-quality patient care.
JEPA was instrumental in the detailed design and engineering of these MEP systems, ensuring that all installations met the highest standards of safety, functionality, and efficiency. This project successfully provided Sismanoglio Hospital with a state-of-the-art Hemodynamic Laboratory, further enhancing its capacity to deliver comprehensive medical services in a modern healthcare setting.