Close

BIOMASS

JEPA has successfully developed a series of biomass projects across Greece, contributing a combined capacity of 44.4 MW. These projects underscore our commitment to utilizing renewable energy sources to meet the nation’s energy demands while promoting sustainability and reducing reliance on fossil fuels. The biomass projects involved the design and implementation of advanced biomass energy systems that convert organic materials into renewable energy. Our team conducted thorough site assessments to determine optimal locations for these installations, considering factors such as resource availability, environmental impact, and compliance with local regulations.

We utilized efficient design solutions to incorporate state-of-the-art combustion technologies and energy conversion processes, ensuring reliable power generation from biomass feedstocks. Each project was designed to integrate seamlessly with existing energy infrastructures, facilitating smooth operation alongside traditional energy sources. Throughout the development of these biomass projects, JEPA prioritized the use of high-quality materials and equipment to ensure longevity and efficiency in energy production. Our emphasis on sustainable practices not only maximized energy output but also aligned with Greece’s objectives for increasing the share of renewable energy in its energy mix.

By implementing these biomass projects, JEPA has played a vital role in advancing Greece’s transition to renewable energy, enhancing energy security, and supporting environmental sustainability throughout the region.

1

Location

GREECE

2

Sector

RENEWABLES

3

Services

DETAILED DESIGN