Close

KSA GID DATA CENTER

The new-built data centre for ICS SA and TCC, developed for the Ministry of Interior (MOI) in Jeddah, Saudi Arabia, was completed in 2014. This expansive facility covers a total area of 8,500 m², featuring two IT spaces of 1,200 m² each, and operates at a Tier III level to ensure reliable performance and uptime, supported by an IT connection power of 5,500 kW. JEPA provided the detailed design and supervision services for the project, ensuring adherence to the highest technical and operational standards. The facility was Tier III certified by the Uptime Institute in August 2015.

1

Client

ICS NET INC. - MINISTRY OF INTERIOR

2

Location

JEDDAH, SAUDI ARABIA

3

Sector

DATA CENTERS

4

Period

2013

5

Services

DETAILED DESIGN, SUPERVISION

Related Projects

QNB DATA CENTER – LUSAIL TOWER

QNB DATA CENTER – LUSAIL TOWER

2024

DATA CENTER – IBC TOKYO OLYMPIC GAMES

DATA CENTER – IBC TOKYO OLYMPIC GAMES

2018

MDRC (MODULAR DATA RECOVERY CENTER) AND PIC (PROJECT INTEGRATION CENTER)

MDRC (MODULAR DATA RECOVERY CENTER) AND PIC (PROJECT INTEGRATION CENTER)

2017

SILVER SHADOW DATA CENTER

SILVER SHADOW DATA CENTER

2014

DIGITAL REALTY – ATHENS I DATA CENTER

DIGITAL REALTY – ATHENS I DATA CENTER

2007

EFG EUROBANK ERGASIAS DATA CENTER

EFG EUROBANK ERGASIAS DATA CENTER

2006

Jepa lines Jepa lines vertical